Claude Code transcript - page 2/2

The header in a single chedule is always duplicated - it says Day 2 at top and then Day 2 again. Remove DEVROOMS from OPTIONS since we moved it to the main menu. use addOptionsMenuItem to keep a DAY option that toggles through DAY1 DAY2 and BOTHDAYS settings. On launch, do a check - if it is 31.01.2026 but before 1800 then pick Day 1. If it is 01.FEB but before 1800 then pick DAY2. ANYWHERE ELSE pick BOTHDAYS. Reduce the header marginBottom/Padding on the LANDING SCREEN.

Thinking

The user wants me to: 1. Fix the duplicate day header issue - it shows Day 2 twice 2. Remove DEVROOMS from the main menu options (since it's in the system menu) 3. Replace the "Both Days" checkbox with an options menu item that cycles through DAY1/DAY2/BOTHDAYS 4. On launch, auto-detect the day setting based on date/time 5. Reduce header margin/padding on the main menu (landing screen)

Let me start by understanding the issues:

  1. The duplicate header issue - I think the problem is that when filtering by day, the first event is always a Day 2 event (or whatever day), so it adds a header. But then there's also the Day 2 divider from the day change detection. Let me check the logic.

Actually, looking at the code, when bothDays is false and we're on Day 1, we filter to only Day 1 events. The first event would be Day 1, so we add a "Day 1" header. Then we also check for day transitions, but there shouldn't be any since all events are Day 1.

Wait, the user said "it says Day 2 at top and then Day 2 again". This suggests that when viewing Day 2 only events, there's a "Day 2" header at the top, and then another "Day 2" header somewhere. Let me look more carefully...

Oh I see the issue! In updateDayDividers(): - We add a header at row 1 if the first event is Day 1 or Day 2 - Then we also scan for day transitions

But if we're in Day 2 only mode (bothDays = false and today = 2), all events are Day 2 events. The first event is Day 2, so we add a Day 2 header at row 1. But then there's no day transition, so no second header should be added...

Unless the issue is that when bothDays = true, we have Day 1 events followed by Day 2 events. We add a Day 1 header at row 1, then add a Day 2 header at the transition.

The bug is likely in the transition detection logic. When scanning through events, if the previous day is Day 1 and current day is Day 2, we add a divider. But I need to check if this is being triggered incorrectly or if there's a duplicate being added somewhere in the header initialization. being shown. The divider might be added twice in certain scenarios. Let me trace through an example with events spanning both days:

  • Event 1: Day 1
  • Event 2: Day 1
  • Event 3: Day 2
  • Event 4: Day 2

When bothDays = true, the first event triggers a Day 1 divider at row 1. Then when scanning for transitions, the shift from Day 1 to Day 2 at event 3 adds another divider at row 3. This should produce the correct layout: Day 1 header, followed by its events, then Day 2 header, then its events.

But when a category only contains Day 2 events (common for single-day devrooms), the first event immediately sets a Day 2 divider at row 1 with no subsequent transitions. That seems right too. The real problem might be in bothDays = false mode when today is Day 2—filtering to only Day 2 events and then handling the first event could be where the duplicate appears. I'm wondering if the duplication stems from showing a day header above the events while the events themselves might also be displaying something, or perhaps the gridview isn't clearing previous state properly.

Looking at what needs fixing: the duplicate day header requires more investigation—possibly we're inserting headers when we shouldn't be. I need to remove DEVROOMS from the menu options entirely. The Both Days checkbox should become an options menu instead. And I should implement auto-detection on launch that sets Day 1 if it's January 31st before 6 PM, or Day 2 if it's February 1st before 6 PM.

Task List
  • Fix duplicate day header in schedule view
  • Remove DEVROOMS from main menu options
  • Replace Both Days checkbox with DAY1/DAY2/BOTHDAYS options menu
  • Auto-detect day setting on launch based on date/time
  • Reduce header padding on main menu screen
Todos have been modified successfully. Ensure that you continue to use the todo list to track your progress. Please proceed with the current tasks if applicable
Thinking

Let me fix the duplicate day header. The issue is likely that when we show only Day 1 or Day 2 events (not both), we're still adding a header. But that makes sense - we should show which day we're viewing. The duplication is confusing.

Wait, I think I understand now. The user might be seeing: - "Day 2" header (from divider) - Then "Day 2" again (maybe another divider?)

Let me re-read the code. Oh! I think the issue is that when bothDays = false, we filter the events, but the first event is now a Day 2 event (if we're on Day 2), so we add a "Day 2" header. But maybe there's also a transition detected somewhere?

Actually, I think the real issue might be simpler - when bothDays is false and we're only showing one day's events, we shouldn't show any day headers at all since all events are from the same day. The day header is only useful when showing both days to separate them.

Let me update the logic: - If bothDays is false, don't show any day headers (since all events are from the same day) - If bothDays is true, show Day 1 header at start (if first event is Day 1) and Day 2 header at the transition

Actually, thinking about it more - the user wants to see day headers for clarity. So when bothDays is true and viewing both days: - Show "Day 1" header above Day 1 events - Show "Day 2" header above Day 2 events

When bothDays is false: - Don't show day headers since all events are from one day

But the user said "Day 2 at top and then Day 2 again". This sounds like when viewing both days, there might be an issue where Day 2 header appears twice.

Let me trace through what happens for Main Track (which has events on both days):

Events (simplified):

  • Event 1: Jan 31 (Day 1)
  • Event 2: Jan 31 (Day 1) ...
  • Event 50: Feb 1 (Day 2) <- transition happens here
  • Event 51: Feb 1 (Day 2)

With bothDays = true, updateDayDividers() should add a divider before the first event if it's Day 1, then detect the transition from Jan 31 to Feb 1 and add another divider there. The duplicate might be happening if the transition detection is firing incorrectly or if there's an off-by-one error in how dividers are being placed.

For a category with only Day 2 events, the first event would trigger a divider for Day 2, and since there's no transition, no additional dividers get added—which is the expected behavior. I should trace through the exact conditions where dividerDays gets set to see if there's a case where it's being set twice for the same row.

Actually, the simpler approach might be better: only display day headers when events span both days. If everything in the current view is from a single day, skip the headers entirely.

Let me fix the duplicate day header issue. The problem is likely that we're showing day headers even when only one day's events are displayed:

✏️ Edit scheduleView.lua
/home/nemo/projects/personal/fosdem-playdate/source/ui/scheduleView.lua
-- Add day dividers for Day 1 and Day 2 headers
function ScheduleView.updateDayDividers()
    ScheduleView.gridview:removeHorizontalDividers()
    dividerDays = {}
    local events = ScheduleView.getCurrentEvents()

    if #events == 0 then return end

    -- Add Day 1 header at the start if first event is on Day 1
    local firstEvent = events[1]
    if firstEvent and firstEvent.DTSTART then
        if firstEvent.DTSTART.day == DAY1_DATE then
            dividerDays[1] = 1
            ScheduleView.gridview:addHorizontalDividerAbove(1, 1)
        elseif firstEvent.DTSTART.day == DAY2_DATE then
            -- First event is Day 2, add Day 2 header
            dividerDays[1] = 2
            ScheduleView.gridview:addHorizontalDividerAbove(1, 1)
        end
    end

    -- Add Day 2 divider where date changes from Day 1 to Day 2
    for i = 2, #events do
        local prevEvent = events[i - 1]
        local currEvent = events[i]
        if prevEvent.DTSTART and currEvent.DTSTART then
            local prevDay = prevEvent.DTSTART.day
            local currDay = currEvent.DTSTART.day
            if prevDay == DAY1_DATE and currDay == DAY2_DATE then
                dividerDays[i] = 2
                ScheduleView.gridview:addHorizontalDividerAbove(1, i)
            end
        end
    end
end
+
-- Add day dividers for Day 1 and Day 2 headers
function ScheduleView.updateDayDividers()
    ScheduleView.gridview:removeHorizontalDividers()
    dividerDays = {}
    local events = ScheduleView.getCurrentEvents()

    if #events == 0 then return end

    -- Check if we have events from both days
    local hasDay1 = false
    local hasDay2 = false
    for _, event in ipairs(events) do
        if event.DTSTART then
            if event.DTSTART.day == DAY1_DATE then
                hasDay1 = true
            elseif event.DTSTART.day == DAY2_DATE then
                hasDay2 = true
            end
        end
        if hasDay1 and hasDay2 then break end
    end

    -- Only show day headers if we have events from both days
    if not (hasDay1 and hasDay2) then return end

    -- Add Day 1 header at the start
    local firstEvent = events[1]
    if firstEvent and firstEvent.DTSTART and firstEvent.DTSTART.day == DAY1_DATE then
        dividerDays[1] = 1
        ScheduleView.gridview:addHorizontalDividerAbove(1, 1)
    end

    -- Add Day 2 divider where date changes from Day 1 to Day 2
    for i = 2, #events do
        local prevEvent = events[i - 1]
        local currEvent = events[i]
        if prevEvent.DTSTART and currEvent.DTSTART then
            local prevDay = prevEvent.DTSTART.day
            local currDay = currEvent.DTSTART.day
            if prevDay == DAY1_DATE and currDay == DAY2_DATE then
                dividerDays[i] = 2
                ScheduleView.gridview:addHorizontalDividerAbove(1, i)
            end
        end
    end
end
The file /home/nemo/projects/personal/fosdem-playdate/source/ui/scheduleView.lua has been updated successfully.
Thinking

Now let me remove DEVROOMS from the main menu options:

Task List
  • Fix duplicate day header in schedule view
  • Remove DEVROOMS from main menu options
  • Replace Both Days checkbox with DAY1/DAY2/BOTHDAYS options menu
  • Auto-detect day setting on launch based on date/time
  • Reduce header padding on main menu screen
Todos have been modified successfully. Ensure that you continue to use the todo list to track your progress. Please proceed with the current tasks if applicable

You've hit your limit · resets 11pm (Europe/Berlin)

continue

API Error: 500 {"type":"error","error":{"type":"api_error","message":"Internal server error"},"request_id":"req_011CXPBcUpuFCYnqma1FGNHL"}

continue

API Error: 500 {"type":"error","error":{"type":"api_error","message":"Internal server error"},"request_id":"req_011CXPBdyjF3nKwDF9gNm9KS"}

continue

API Error: 500 {"type":"error","error":{"type":"api_error","message":"Internal server error"},"request_id":"req_011CXPC2mcNXeAD3EiQtB2m5"}